Civil Work

  • Depth of the Earth work excavation for foundations is according to the structural Design and Detailed drawing. (Excavation quantity may vary based on site condition, maximum 60 depth allowed)
  • Laying of P.C.C 1:4:8 using 40 mm metal laid in layers 75mm thick for foundations.
  • The height of the formed ground car parking level from the Road level is 16
  • The height of the ground level from the Road level is 36(Including finishing) or as allowed by the authorities
  • Width of the External Plinth Beam is 13x09
  • All Concrete 1:2:4 ratio Footing/Column/Beam and Roof Slab(RMC) (Cement: M Sand)
  • Back filling for the foundations using excavated earth would be well watered and consolidated (msand quarry powder waste)
  • Basement brick work in CM 1:5 using quality Bricks for 230 mm thick above Plinth Beam.
  • External wall 9 clay WIRE CUT BRICK work (basic cost of brick INR 10.50/)--.
  • Internal partition wall 4.5 WIRE CUT BRICK work (basic cost of brick INR10.50/)-.
  • Parapet Wall 4.5 Clay WIRE CUT BRICK 30 height (basic cost of brick INR10.50/)-
  • The clear floor height is 100 (including roof slab) to the bottom of the roof slab or as allowed by the authorities based on construction variations
  • The super structure Brick work up to lintel and roof should be completed on all aspects before concreting of each state.
  • Lintels- cut lintel as per architectural design
  • Sunshade 16 projected from the external walls.
  • Inner and outer plastering thickness should not be more than 12mm with normal finishes
    (Cement:P sand).
  • RCC surfaces plastering with CM 1:5 (Cement:M Sand).
  • Supply and fabrication of TMT ISI steel for all RCC works Fe550 Basic Cost Of Steel-INR70/-per kg.
    (GBR TMT/ARS TMT)
  • Cement used for construction-specific Grade as per Structural Engineers recommendation. Cement Brand: FOR RCC WORK CORAMANTAL/ DALMIA Basic Cost Of Cement-INR380/-

Flooring

  • Supply and laying of flooring with vitrified tiles 2'X 2 size 10mm thick @ INR50/- sq.ft over mortar bed in CM 1:8 including pointing and finishing for ground floor and first floor.
  • Toilet floor tiles 10x10 Basic cost INR45/- Toilet wall tiles basic cost of tiles INR45/- upto 70 height all side
  • Supply and laying of Path Tiles @ Rs40/- per sq.ft * over mortar bed in 1:8 including pointing and finishing, staircase, landing car parking
  • Kitchen Granite 100; Maximum length allowed, Kitchen Wall tiles 20height over the counter. basic cost of Granite INR70/-
  • All bedroom 40length Kadapa shelves provided, for kitchen 60 Kadapa shelves included.

Pest Control

Anti termite treatment has to be carried out in following stages:

  • After Earth work Excavation for footing.
  • After basement filling (injection at every 3 feet level) Treatment for wooden joineries.

Doors

    Main Door: (3'3”X 7'0”) 1nos
    • Main Door: Teak Wood frame with Teak Wood shutter (door INR 14500/-)
      (Basic cost of frame INR 5500/- Lock-2500/-)
    • Frame size: 5X 4
    • Fittings: Regular Fittings Brass Finish
    • 3 no of 5 Hinges for Main door shutters.
    • 8 at top and 6 at bottom Tower Bolt for Door shutters.
    • Any decorative beading not included for any wood work
    Room Door: (3'0”X 7'0”)
    • Teak wood frame with readymade membrane door 30mm thick (Basic cost of frame -INR 3500/- Shutter basic cost-inr 2800/- ss antic finish lock-inr 900/-)
    • Frame size: 4X 3
    • Fittings: Regular Fittings
    • 3 no of 5 Hinges for Main door shutters.
    • 8 at top and 6 at bottom Tower Bolt
    • Water Proof Pvc Door for toilet
    • Kitchen and Pooja door not included

V Windows

  • Frame : 4 thick wooden frame and 1 thickness windows shutter all 4 side 3 frame middle 3mm pined glass (master bedroom 2nos size (3x4), other bedroom -2nos size (3x4), / kitchen 1nos size (3x3), living 2nos size (4x4),, dining 1nos size (3x4), all toilet 2x2 ventilater with exhaust provision )
  • Fittings: Regular Fittings
  • Glass: 3mm Clear Glass.
  • Grills with 10mm square rods.

Staircase Handrail

  • SS Handrail 30 Height, Railing Made By SS 10mm Square bar. Top rail 1.5 SS Circular top railing. Cost included material labour and fixing (Basic cost 650/-per rft).

Painting Work

  • Providing and painting two coats of Asian premium Emulsion paint over two coats of wall putty over one coat of wall primer for internal walls. for ceiling one coat primer two coat Asian Tractor Emulsion paint finish.
  • Providing and painting two coats of weather coat paint Asian APEX, over one coat of white cement for external wall, Passage, Staircase and common area.
  • Providing and painting two coats of varnish Finish for Main door.
  • Enamel paint finish for grill and all other door frames.

Electrical

  • Concealed boxes:GI box
  • Wires:Orbit
  • Distribution board:Standard with door.
  • No.of distribution boards: One DB for building
  • MCB's & Isolators:ANGER/STD
  • Rotary Switch:Domestic Range
  • Switches:Star X/ Orbit/ Sleek
  • Fan regulator:Switch Type
  • Fan hook:G.I.
  • Bedrooms:2nos light point, 2nos 5amp Socket, 1nos fan point & 1nos AC point
  • Toilet:1nos Gyeser Point, 1nos light point , 1 nos exhaust point
  • Hall/Dining:4nos of light point, 2 fan point, 3nos of tv power socket.
  • Fan hook:2nos of 15amps socket, 2nos 5amp socket, 1nos of fan point, 2nos of light point,1nos RO point.

Plumbing

  • Inner Cold water Pipes CPVC (asirwath)
  • External Water line Pipe PVC (star/supreme)
  • Inner Hot water pipes CPVC (asirwath)
  • Soil and waste water pipes PVC (Regular)
  • Plumbing Fittings: 2 in 1 wall Mixer (inr4200/-)Head shower/rod (inr1000/-) Parryware
  • Hand shower for master bedroom Inr1500/-
  • Sink: KAG Single bowl SS Sink inr 3000/-
  • EWC: Floor mounted Open tank - White colour - Parryware (ewc/tank inr5500/-)
  • Sink Tap: Long Body tap inr900/-
  • PVC traps: SS open door type.
  • Wash basin inr1100/- tap-inr400/-Parryware

Annexure II

Commercial Offer
  • Architectural Drawings: Floor Plan builder scope.
  • 1000ltr water tank pvc tank.
  • Staircase SS railing Included.
  • Floor plan and building front elevation view contractor scope.
  • Soil test.
  • Structural design(SOMADEV NAGESHConsulting Engineer)
Important Note:
  • GST not added in above price. Client Require GST invoice means 18% GST added Extra.
  • Any other bribes for local body client scope.
  • Roof area will be consider as billing construction area.
  • If any additional changes or correction client side amount will be chargeable.
  • Power, Water will be client scope
  • From the day of stage completion within 15days payment has to be released for next stage.
Exclusive
  • Elevation Tiles, wood and granite not included.
  • Weathering Coarse/Weathering Tile Not included.
  • Approval and EB connection cost not included.
  • Motor, Sump, Septic tank and compound wall not included.
  • Safety grill for doors not included.
  • False ceiling, wardrobe, landscapr, paver maingate, wicket gate related piller and showcase any other wood works not included.
  • Pile foundation difference cost

Annexure III

Payment Details & Schedule and Details
S.No Description Quantity Rate Amount
1 Ground Floor      
2 First Floor      
3 Headroom        
         
         
         
(Cost only for building construction area)
S.No Details Stage Amount
1 Agreement Signing 3% of Total Cost  
2 Mobilization Advance 17% of Total Cost  
3 Basement Completed 20% of Total Cost  
4 Ground Floor Brick Work 7.5% of Total Cost  
5 Ground Floor Roof Completed 15% of Total Cost  
6 First Floor Brick Work 7.5% of Total Cost  
7 First Floor Roof Completed 15% of Total Cost  
8 Plastering Completed 10% of Total Cost  
9 Handover 5% of Total Cost  
Employer Contractor